bridge-09
The legs on this multi-section deck plate girder bridge needed special consideration to clear the swing-out of locomotives and long cars traveling on the curved track below.
The legs on this multi-section deck plate girder bridge needed special consideration to clear the swing-out of locomotives and long cars traveling on the curved track below.